C1000-055

Practice C1000-055 Exam

Is it difficult for you to decide to purchase IBM C1000-055 exam dumps questions? CertQueen provides FREE online IBM QRadar SIEM V7.3.2 Deployment C1000-055 exam questions below, and you can test your C1000-055 skills first, and then decide whether to buy the full version or not. We promise you get the following advantages after purchasing our C1000-055 exam dumps questions.
1.Free update in ONE year from the date of your purchase.
2.Full payment fee refund if you fail C1000-055 exam with the dumps

 

 Full C1000-055 Exam Dump Here

Latest C1000-055 Exam Dumps Questions

The dumps for C1000-055 exam was last updated on Dec 01,2021 .

Viewing page 1 out of 2 pages.

Viewing questions 1 out of 12 questions

Question#1

A deployment professional has been asked to ensure the system can be integrated with another system which contains lists of IP addresses and CIDR ranges in an automated manner, to allow rules to target specific communication endpoints.
Which part of QRadar is designed to hold and manage this data?

A. Domain Definition
B. Network Hierarchy
C. Asset Profiles
D. Building Blocks

Question#2

A deployment professional needs to implement a crossover cable in the high availability (HA) environment.
By doing so, this QRadar deployment isolates what kind of traffic over the crossover connection?

A. event
B. flow
C. query
D. HA replication

Question#3

A deployment professional is asked to create QRadar deployment architecture for a company.
The company has three branch offices with WAN connection between them. The head office data center requires 14000 EPS and 200000 FPM. Each branch requires 4000 EPS and 200000 FPM.
Which deployment solution will meet the minimum requirements?

A. QRadar 3105 (Console) in head office + QRadar 1805 Event and Flow Processor in each branch office
B. QRadar 3129 (Console) in head office + QRadar 1805 Event and Flow Processor in each branch office
C. QRadar 3105 (Console) and QRadar Event and Flow Processor 1829 in head office + QRadar 1805 Event and Flow Processor in each branch office
D. QRadar 3129 (All-in-One) in head office

Question#4

Two newly installed QRadar applications are creating performance issues at the console .
How should the deployment professional proceed?

A. Deploy one App Node, move apps from the console and test if the situation improves.
B. Deploy one App Host, move apps from the console and test if the situation improves.
C. Deploy two different App Hosts as both applications might need dedicated resources. App auto-balancing is enabled by default.
D. Deploy two different App Nodes as both applications might need dedicated resources. App auto-balancing is enabled by default.

Question#5

A deployment professional is faced with the following system notification.
38750107 - The last attempt to read in rules (usually due to a rule change) has failed.
Please see the message details and error log for information on how to resolve this.
What should the deployment professional do after trying to disable and enabling the rule?

A. Create a new rule without deleting the old rule.
B. Delete and recreate the rule.
C. Modify the rule.
D. Before doing anything else, call customer support.

Exam Code: C1000-055         Q & A: 60 Q&As         Updated:  Dec 01,2021

 

 Full C1000-055 Exam Dumps Here