Is it difficult for you to decide to purchase SAP C_TS422_2023 exam dumps questions? CertQueen provides FREE online SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing C_TS422_2023 exam questions below, and you can test your C_TS422_2023 skills first, and then decide whether to buy the full version or not. We promise you get the following advantages after purchasing our C_TS422_2023 exam dumps questions. 1.Free update in ONE year from the date of your purchase. 2.Full payment fee refund if you fail C_TS422_2023 exam with the dumps
Latest C_TS422_2023 Exam Dumps Questions
The dumps for C_TS422_2023 exam was last updated on Apr 18,2026 .
Viewing page 1 out of 3 pages.
Viewing questions 1 out of 16 questions
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
Explanation: The subitems of a bill of material (BOM) are the components that make up the product or assembly. You can maintain the following data for each subitem: Quantity: This is the number of units of the component that are required for one unit of the product or assembly. You can specify the quantity in different units of measure, such as base unit, order unit, or alternative unit. You can also use variable quantities, such as percentages or formulas, to calculate the quantity dynamically based on the product or assembly characteristics. Scrap percentage: This is the percentage of the component that is expected to be wasted or lost during the production or assembly process. You can specify the scrap percentage for each component to adjust the quantity accordingly. For example, if the quantity of a component is 10 and the scrap percentage is 5%, the system will increase the quantity by 0.5 to account for the scrap. The installation point (A) and the item type (B) are not data that you can maintain in the subitems of a BOM. The installation point is a field in the equipment master record that indicates where the equipment is installed. The item type is a field in the sales document item that determines the processing and pricing of the item. These fields are not relevant for the BOM subitems. Reference: https://sapstack.com/pp/bom-in-sap-bill-of-material/ https://skillstek.com/bill-of-material-in-sap/
where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 Correct answers to this question.
Explanation: The system checks the master data selection settings during the creation of planned orders and production orders in the following places: In the bill of material (BOM), the system checks the selection ID, which determines which alternative BOM is selected for the material. The selection ID can be maintained in the material master or in the production version. In the routing, the system checks the selection ID, which determines which alternative routing is selected for the material. The selection ID can be maintained in the material master or in the production version. In the production version, the system checks the validity period, the lot size, and the selection profile, which determine whether the production version is valid and applicable for the material. The production version combines the BOM and the routing for a material and can be maintained in the material master or in the production version master data. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 16; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 75.
During production order creation, several valid production versions are found. How does the system choose the production version?
Explanation: The system chooses the production version based on the validity period and the sales order. The validity period determines whether the production version is valid for the planned start date of the production order. The sales order determines whether the production version is assigned to a specific sales order item or not. If there are multiple production versions that meet these criteria, the system chooses the one with the lowest alphanumeric value. Reference: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 113; [SAP Help Portal: Production Version]
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Explanation: Planning with final assembly (40) is a planning strategy that supports the consumption of planned independent requirements for the semi-finished material. This strategy is used when the production of the finished product is triggered by the sales order, but the production of the semi-finished product is not. The semi-finished product is produced in advance based on the forecast and stored in stock. When the sales order is received, the planned independent requirements for the finished product are reduced by the sales order quantity, and the planned independent requirements for the semi-finished product are reduced by the corresponding component quantity. This way, the semi-finished product is consumed by the sales order and the production order for the finished product only requires the assembly of the components. This strategy allows for a shorter lead time and a higher flexibility for the finished product, while reducing the risk of excess stock for the semi-finished product. Reference: Planning with Final Assembly | SAP Help Portal, Planning Strategies | SAP Help Portal, SAP S/4HANA Production Planning and Manufacturing Certification Guide, page 53-54
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
Explanation: The Advanced Planning flag is a field that indicates whether a data object is relevant for planning with Production Planning and Detailed Scheduling (PP/DS) in SAP S/4HANA. PP/DS is a component of Advanced Planning that provides more precise and flexible planning capabilities for critical products and resources. You can set the Advanced Planning flag for the following data objects: Work Center: This is a master data object that represents a location where operations are performed. A work center can have different capacities, such as machine, labor, or power, that are used for scheduling and capacity planning. You can set the Advanced Planning flag for a work center to enable it for PP/DS planning. This means that the work center can be used as a resource in PP/DS and its capacity can be optimized by PP/DS heuristics or optimization tools. Material: This is a master data object that represents a product or a component that is produced, procured, or consumed in a business process. A material can have different views, such as basic data, MRP, sales, or production, that contain different attributes and parameters for planning and execution. You can set the Advanced Planning flag for a material to enable it for PP/DS planning. This means that the material can be planned with exact times and quantities in PP/DS and its availability can be checked by PP/DS pegging. The production version (B) and the plant (D) are not data objects that can have the Advanced Planning flag. The production version is a master data object that defines the combination of a bill of material (BOM) and a routing or a production process model (PPM) for a material. The production version does not have a separate flag for PP/DS, but it inherits the flag from the material and the work center. The plant is an organizational unit that represents a physical location where materials are produced or stored. The plant does not have a flag for PP/DS, but it is assigned to a location in PP/DS that represents the geographical or logical grouping of plants for planning purposes. Reference: https://blogs.sap.com/2018/02/12/ppds-for-sap-s4hana-advanced-planning-a-powerful-planning-and-scheduling-tool/ https://learning.sap.com/learning-journeys/explore-integrated-business-processes-in-sap-s-4hana-/advanced-planning_ae824eb6-4bf8-4720-a48f-ba86929a14de