Question#1

What test should be used to determine the compressive strength of concrete?

A. Slump test
B. Cylinder test
C. Air test
D. Sieve test

Explanation:
Concrete compressive strength is determined by loading a standard molded specimen to failure in a compression testing machine and calculating strength from the peak load divided by the specimen’s cross-sectional area. The common acceptance specimen for cast-in-place concrete is a cylinder, produced and cured using standardized procedures to ensure that test results reliably represent the delivered concrete. Civil engineering materials references describe compressive strength testing as the principal measure used to verify compliance with specified strength (f’c), and that cylinder specimens are tested in compression to determine the maximum stress sustained.
A slump test measures workability/consistency, an air test measures entrained air content, and sieve testing measures aggregate gradation―none of these directly measure compressive strength.
Therefore, the required test for compressive strength is the cylinder test (Option B).

Question#2

A 500 mm diameter corrugated steel culvert conveys storm water under a road. The inlet end projects from the road embankment fill.
How much flow (m³/s) can the culvert handle before the headwater depth is greater than the culvert diameter?

A. 0.2 m³/s
B. 2.0 m³/s
C. 20 m³/s
D. 200 m³/s

Explanation:
For a projecting inlet, the controlling condition is typically inlet control at relatively low headwater ratios. Using the FHWA/HDS-5 style inlet-control nomographs reproduced in the Minnesota DOT Drainage Manual (Chart 2: “Headwater depth for C.M. pipe culverts with inlet control”), a corrugated metal pipe (CMP) with a diameter near500 mm (20 in.) and a projecting entrance type corresponds to a discharge on the order of~7 cfs when HW/D 1.0 (headwater approximately equal to the culvert diameter). Converting 7 cfs to SI givesm³/s. This magnitude is consistent with the inlet-control relationship that headwater increases with discharge for a given culvert diameter and entrance configuration, and that small culverts (0.5 m) carry flows measured in tenths of m³/s, not multiple m³/s at HW/D 1.

Question#3

4 An application that does not fulfill the above requirements shall be referred to Council.

A. Approve the application because it meets all requirements.
B. Reject the application because the rear yard setback is too large.
C. Refer the application to Council because it does not meet the requirements.
D. Reject the application because one of the side yard dimensions and the main floor area are not sufficient.

Explanation:
The bylaw excerpt establishes mandatory requirements (one family, minimum 120 m² floor area, and minimum setbacks) and then provides the required administrative action in Section 3.4: any application that does not fulfill the above requirements shall be referred to Council. The correct decision is therefore governed directly by the regulatory text: when any requirement is not met, the prescribed next step is referral rather than approval.
Option C matches the bylaw’s stated process exactly by directing the application to Council due to noncompliance.
Options B and D propose outright rejection reasons that the excerpt does not authorize as the required action; the excerpt explicitly states “referred to Council” for noncompliant applications.
Option A is only valid when all requirements are met. Accordingly, the correct response is refer to Council.

Question#4

A civil engineering technologist has been asked to check the following foundation plan drawing.
How many different sizes of concrete piles are required in this project?


A. One
B. Two
C. Three
D. Four

Explanation:
Pile sizing on a foundation plan is determined by the pile schedule/legend and callouts that specify different pile types or diameters (and sometimes lengths/capacities) used in different locations to suit varying loads or subsurface conditions. Reviewing a foundation plan for “how many pile sizes” means identifying the distinct pile designations listed in the schedule (e.g., P1, P2, P3, P4), each corresponding to a different concrete pile size/specification. Engineering drawing practice requires reading the schedule and matching symbols/marks to their definitions to count unique sizes, not simply counting total piles on the plan. In the provided drawing, the pile schedule indicates four distinct pile sizes/designations, so the project requires four different sizes of concrete piles.

Question#5

A civil engineering technologist is designing a sanitary collection system that is being constructed below the groundwater table. The owner requested that the system be pressure tested in order to minimize the infiltration into the collection system.
Which of the following would be a major design consideration for the collection system?

A. Pipe diameter
B. Pipe material
C. Manhole type
D. Manhole material

Explanation:
When sanitary infrastructure is installed below the groundwater table, a primary risk is infiltration―groundwater entering the system through joints, defects, and especially appurtenances. Even if pipe joints are specified as watertight and pipes can pass leakage testing, manholes are frequent infiltration pathways due to multiple penetrations (service connections), interfaces (frame-to-cone), and exposure to groundwater head. Civil engineering references identify infiltration/inflow sources that include “holes in manhole covers” and other manhole-related entry paths, highlighting that manholes are critical control points in sanitary systems.
Therefore, a major design consideration―particularly whessure/leakage testing to reduce infiltration―is specifying a watertight manhole type (e.g., gasketed/booted connections, sealed sections, appropriate access components) suitable for submerged conditions. Pipe diameter primarily affects hydraulic capacity, and “manhole material” alone does not fully address leakage performance unless paired with watertight design features. The best answer is manhole type.

Exam Code: Civil Engineering Technology
Q & A: 110 Q&As         Updated:  Nov 02,2026

 

 Access Complete Civil Engineering Technology Preparation Material

What This Civil Engineering Technology Study Resource Helps You Do

Review Key Concepts

Review the technologies, products, processes, and practical skills covered by the current Civil Engineering Technology exam objectives.

Practice Scenario-Based Questions

Work through independently developed questions designed to strengthen your understanding of technical scenarios and decision-making.

Identify Knowledge Gaps

Use your results and the provided explanations to find weaker areas and focus your study more effectively.

How to Use This Civil Engineering Technology Preparation Material

Review the Exam Scope

Start by reviewing the topics covered by the Civil Engineering Technology exam. Compare them with the official exam objectives to understand the required technologies, operational tasks, and practical skills, then identify the areas that deserve the most attention.

Practice Independently

Complete a focused set of practice questions for each topic. On your first attempt, avoid referring to notes, answers, or other study resources so that you can evaluate your current understanding more accurately.

Study the Explanations

Review the answers and explanations after completing each practice session. Understand why the correct option is appropriate for the given scenario and why the other options may be incorrect or less suitable.

Close Knowledge Gaps

Keep track of incorrect answers, unfamiliar concepts, and weaker knowledge areas. Review these topics using official documentation and practical experience, then answer the related questions again to reinforce your understanding and monitor your progress.

Independent Civil Engineering Technology Preparation Resource

CertQueen independently develops its certification study materials for educational purposes. The practice questions are not copied from, recalled from, or presented as live or official exam questions.

CertQueen is not affiliated with, endorsed by, sponsored by, or authorized by any certification provider. Certification names, exam codes, product names, and related trademarks are the property of their respective owners and are referenced only for identification and educational purposes.