D-PEMX-DY-23

Practice D-PEMX-DY-23 Exam

Is it difficult for you to decide to purchase DELL EMC D-PEMX-DY-23 exam dumps questions? CertQueen provides FREE online Dell PowerEdge MX Modular Deploy 2023 Exam D-PEMX-DY-23 exam questions below, and you can test your D-PEMX-DY-23 skills first, and then decide whether to buy the full version or not. We promise you get the following advantages after purchasing our D-PEMX-DY-23 exam dumps questions.
1.Free update in ONE year from the date of your purchase.
2.Full payment fee refund if you fail D-PEMX-DY-23 exam with the dumps

 

 Full D-PEMX-DY-23 Exam Dump Here

Latest D-PEMX-DY-23 Exam Dumps Questions

The dumps for D-PEMX-DY-23 exam was last updated on Jun 14,2025 .

Viewing page 1 out of 5 pages.

Viewing questions 1 out of 27 questions

Question#1

What are two requirements to achieve 100 GbE network speeds for a compute sled?
(Select 2)

A. Z9432F-ON
B. Quad-port NIC
C. MX7116n
D. MX9116n
E. Dual-port NIC

Question#2

An administrator is configuring a fully populated MX5016s storage sled to be accessed by four MX740c compute sleds. Each compute sled has an H745P Jumbo PERC installed. The disks in the storage sled are evenly distributed across all compute sleds using a Drive-Assigned storage configuration.
What is the maximum number of disks that each compute sled can detect from the MX5016s?

A. 1
B. 2
C. 4
D. 16

Question#3

Which two-socket PowerEdge sled can support up to eight E3.s NVMe Gen 5 SSD drives?

A. MX740c
B. MX750c
C. MX760c
D. MX840c

Question#4

What are the components of the control panel of a PowerEdge MX750c sled?

A. Power button USB 3.0 port micro DisplayPort iDRAC direct status LED
B. Power button USB 2.0 port micro DisplayPort iDRAC direct status LED
C. Power button USB 3.0 port iDRAC micro port iDRAC direct status LED
D. Power button USB 2.0 port iDRAC micro port iDRAC direct status LED

Question#5

An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The MX700 has seven MX740c, one MX5016s, two Management Modules (MMs), an LED-Only control panel, two MX9116n in Fabric A, two MX5108n in Fabric B, and two MX5000s in Fabric C.
What is a valid method to perform the initial MX platform configuration?

A. Use a serial DB9 / DB cable
B. Use KVM and racadm setniccfg command from MM configuration menu
C. Use Ethernet front panel port default DHCP address
D. Use QuickSync 2

Exam Code: D-PEMX-DY-23         Q & A: 135 Q&As         Updated:  Jun 14,2025

 

 Full D-PEMX-DY-23 Exam Dumps Here