Question#1

A Client is fitting out a building with area 20,500 ft2 (1 904.5 m2) and wishes to pursue the Energy and Atmosphere Credit, Enhanced Commissioning.
Who may be appointed as the Commissioning Authority (CxA) for the project?

A. An employee of the architecture or engineering firm but not a member of the design team
B. A sub-consultant to the architecture or engineering firm but not a member of the design team
C. A subcontractor of the general contractor or construction manager but not a member of the construction team
D. An employee or subcontractor of the general contractor or construction manager and a member of the construction team

Explanation:
For the Energy and Atmosphere Credit, Enhanced Commissioning, the Commissioning Authority (CxA) plays a crucial role in overseeing the commissioning process. The CxA must be independent of the project's design and construction team to maintain objectivity. An employee of the architecture or engineering firm involved in the project could potentially have a conflict of interest. Similarly, a member of the construction team could also have biases that might affect the commissioning process's integrity. Therefore, a sub-consultant to the architecture or engineering firm, who is not part of the project's design team, is an appropriate choice for the CxA role, ensuring independence and impartiality in the commissioning process.
Reference: LEED v4 for Interior Design and Construction Reference Guide, particularly the section on Energy and Atmosphere Credit, Enhanced Commissioning

Question#2

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project.
If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

A. Innovation Credit, Option 1. Innovation
B. Materials and Resources Credit, Construction and Demolition Waste Management
C. Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices
D. Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

Explanation:
Reusing existing materials from another building, like the raised flooring in this case, contributes to the LEED goal of reducing the demand for virgin materials and minimizing environmental impact. This reuse can be considered as part of the Building Life Cycle Impact Reduction credit, which falls under the umbrella of Materials and Resources credits. Specifically, Option 3 of this credit deals with building and material reuse. By refurbishing and reinstalling an existing raised floor, the tenant's actions demonstrate leadership in extraction practices because they are extending the lifecycle of existing materials, thereby reducing the need for new materials and the environmental burden associated with material extraction and processing.
Reference: Information about the Building Life Cycle Impact Reduction credit within Materials and Resources, clarifying the options for earning points through material reuse.

Question#3

Regarding the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, in addition to materials costs, what information is needed to determine the total cost of each product?

A. Taxes and delivery costs
B. Taxes and installation costs
C. Installation equipment and labor
D. Transportation costs and installation labor

Explanation:
For the Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of
Raw Materials, Option 2, Leadership Extraction Practices, the total cost determination of each
product includes not only the materials costs but also the transportation costs and installation
labor. This is because these factors contribute to the overall expense of the product from its origin to
its final installed state in the project1.
Reference: LEED v4 for Interior Design and Construction Reference Guide2.
LEED Credit Library - Materials and Resources3.
LEED user’s discussion on Building Product Disclosure and Optimization4.

Question#4

What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

A. 25%
B. 50%
C. 75%
D. 90%

Explanation:
The LEED requirements for Indoor Environmental Quality, Thermal Comfort, necessitate that at least 50% of individual occupant spaces have individual thermal comfort controls. This allows occupants to adjust the thermal conditions in their immediate environment to suit their personal comfort levels.
Reference: The LEED v4 reference guide for Interior Design and Construction details the need for individual thermal comfort controls in at least half of the occupant spaces to promote occupant comfort and well-being1. Additionally, resources like LEED user provide guidance on implementing these requirements in practice2.

Question#5

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning.
Which qualification must the agent meet?

A. Subcontractor of construction manager
B. Not an employee of the project design firm
C. Member of the Building Cx Association
D. Commissioning Authority (CxA) with experience in at least one prior project

Explanation:
The Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning, must be independent of the project’s design and construction management to avoid conflicts of interest. This ensures that the Cx agent can objectively assess the project’s performance and adherence to design intentions.
Reference: The LEED v4 reference guide for Interior Design and Construction specifies that the Cx agent should not be an employee of the design firm to maintain independence1. Additionally, the LEED AP with Specialty Candidate Handbook outlines the importance of the Cx agent’s independence in the commissioning process2.

Exam Code: LEED AP ID+C
Q & A: 100 Q&As         Updated:  Oct 17,2026

 

 Access Complete LEED AP ID+C Preparation Material

What This LEED AP ID+C Study Resource Helps You Do

Review Key Concepts

Review the technologies, products, processes, and practical skills covered by the current LEED AP ID+C exam objectives.

Practice Scenario-Based Questions

Work through independently developed questions designed to strengthen your understanding of technical scenarios and decision-making.

Identify Knowledge Gaps

Use your results and the provided explanations to find weaker areas and focus your study more effectively.

How to Use This LEED AP ID+C Preparation Material

Review the Exam Scope

Start by reviewing the topics covered by the LEED AP ID+C exam. Compare them with the official exam objectives to understand the required technologies, operational tasks, and practical skills, then identify the areas that deserve the most attention.

Practice Independently

Complete a focused set of practice questions for each topic. On your first attempt, avoid referring to notes, answers, or other study resources so that you can evaluate your current understanding more accurately.

Study the Explanations

Review the answers and explanations after completing each practice session. Understand why the correct option is appropriate for the given scenario and why the other options may be incorrect or less suitable.

Close Knowledge Gaps

Keep track of incorrect answers, unfamiliar concepts, and weaker knowledge areas. Review these topics using official documentation and practical experience, then answer the related questions again to reinforce your understanding and monitor your progress.

Independent LEED AP ID+C Preparation Resource

CertQueen independently develops its certification study materials for educational purposes. The practice questions are not copied from, recalled from, or presented as live or official exam questions.

CertQueen is not affiliated with, endorsed by, sponsored by, or authorized by any certification provider. Certification names, exam codes, product names, and related trademarks are the property of their respective owners and are referenced only for identification and educational purposes.

Exam Code: LEED AP ID+C
Q & A: 100 Q&As
Updated:  Oct 17,2026

 

 Access Complete LEED AP ID+C Preparation Material