NCP-BC-7.5 Exam Preparation Material | Nutanix Certified Professional - Business Continuity v7.5

Prepare for the NCP-BC-7.5 with reliable study materials, practice questions, and key exam insights.

Prepare for the NCP-BC-7.5 Nutanix Certified Professional - Business Continuity v7.5 exam with CertQueen's independently developed study resources. Review important concepts, practice scenario-based questions, and use clear explanations to identify areas that require further study.

Question#1

What is the expected outcome that the administrator must manage?

A. The primary site will continue to serve I/O locally to prevent downtime, while the secondary site remains in standby.
B. The secondary site will acquire the lock after a built-in delay, and the primary site will halt all I/
C. The Witness will automatically shut down the secondary site to protect data integrity on the primary site.
D. Both sites will attempt to acquire the lock, but the primary site will acquire the lock and continue to serve I/O locally to prevent downtime.

Question#2

A company's two clusters are part of the same availability zone. Prism Central, which holds the protection policy configuration and recovery plans, is located on Cluster A and protected by the Prism Central Backup and Restore mechanism.
What is the first step to take to execute a disaster recovery plan on the datacenter hosting Cluster A?

A. Restore the Prism Central instance from Prism Element on the surviving cluster.
B. Deploy a new Prism Central instance on the surviving cluster and register the cluster to it to access the replicated VM snapshots.
C. Log into Prism Element on the surviving cluster and execute the Recovery Plan.
D. Access the Prism Central web interface via its Floating IP to trigger the "Unplanned Failover" workflow for the affected VMs.

Question#3

When designing a Disaster Recovery strategy to an NC2 cluster using MST, which technical limitation impacts the Recovery Plan and workload compatibility?

A. The "Zero Compute" configuration requires manual restoration of workloads (automated failover is not supported), and MST currently only protects AHV VMs.
B. To ensure resilience on NC2, both MST DR and "Cluster Protect" features must be configured simultaneously on the same cluster.
C. Automated failover is natively supported in the "Zero Compute" configuration but strictly requires configuring an external IPAM to manage and reassign IP addresses.
D. The "Pilot Light" configuration allows to select multiple on-premise clusters as sources within a single protection policy to automate the failover of AHV and ESXi VMs.

Question#4

An administrator at a retail company is preparing to apply a critical OS security patch to a production SQL Server VM. Before starting, the administrator ensures the VM is part of a Protection Domain and manually creates a local snapshot (Recovery Point).
Ten minutes after the patch is applied, the SQL service fails to start, and the database logs indicate corruption in the system registry. The administrator needs to return the VM to its functional state from ten minutes ago as quickly as possible. The administrator decides to perform a Restore from the local snapshot.
Under which condition would an In-place Restore (Revert) fail, forcing the administrator to use the Clone (Out-of-place) option instead?

A. NGT (Nutanix Guest Tools) version was updated immediately after the snapshot.
B. The VM's memory was increased from 16GB to 32GB to accommodate the patch installation.
C. The VM is currently powered on and cannot be shut down.
D. A new 50GB data disk was added to the VM configuration after the snapshot was taken.

Question#5

An administrator notices that VM replication from ClusterA to ClusterB fails consistently at the same point during the replication job.
The following observations are noted by the administrator:
The Prism dashboard shows the replication job failing during snapshot creation.
ClusterB storage pool and container usage is under 80%, well below capacity.
Network latency/Pings between ClusterA and ClusterB averages 3ms, with occasional spikes to 25ms.
VM event logs indicate frequent I/O timeout errors during the replication window.
Both clusters are running compatible AOS versions.
What is the most likely cause for the failing replications?

A. Misconfigured/Overlapping replication schedules.
B. Insufficient cluster storage on Cluster
C. Required Nutanix TCP replication ports are blocked.
D. Network instability impacting snapshot replication.

Exam Code: NCP-BC-7.5
Q & A: 109 Q&As         Updated:  Oct 20,2026

 

 Access Complete NCP-BC-7.5 Preparation Material

What This NCP-BC-7.5 Study Resource Helps You Do

Review Key Concepts

Review the technologies, products, processes, and practical skills covered by the current NCP-BC-7.5 exam objectives.

Practice Scenario-Based Questions

Work through independently developed questions designed to strengthen your understanding of technical scenarios and decision-making.

Identify Knowledge Gaps

Use your results and the provided explanations to find weaker areas and focus your study more effectively.

How to Use This NCP-BC-7.5 Preparation Material

Review the Exam Scope

Start by reviewing the topics covered by the NCP-BC-7.5 exam. Compare them with the official exam objectives to understand the required technologies, operational tasks, and practical skills, then identify the areas that deserve the most attention.

Practice Independently

Complete a focused set of practice questions for each topic. On your first attempt, avoid referring to notes, answers, or other study resources so that you can evaluate your current understanding more accurately.

Study the Explanations

Review the answers and explanations after completing each practice session. Understand why the correct option is appropriate for the given scenario and why the other options may be incorrect or less suitable.

Close Knowledge Gaps

Keep track of incorrect answers, unfamiliar concepts, and weaker knowledge areas. Review these topics using official documentation and practical experience, then answer the related questions again to reinforce your understanding and monitor your progress.

Independent NCP-BC-7.5 Preparation Resource

CertQueen independently develops its certification study materials for educational purposes. The practice questions are not copied from, recalled from, or presented as live or official exam questions.

CertQueen is not affiliated with, endorsed by, sponsored by, or authorized by any certification provider. Certification names, exam codes, product names, and related trademarks are the property of their respective owners and are referenced only for identification and educational purposes.

Exam Code: NCP-BC-7.5
Q & A: 109 Q&As
Updated:  Oct 20,2026

 

 Access Complete NCP-BC-7.5 Preparation Material